ANRE electricity and gas supply licences: preparing the application

Supplying electricity or gas requires more than incorporating a company and signing the first customer. Choose the route for the activity, demonstrate resources and staffing, and establish customer arrangements. An incomplete file can delay launch even when every document is supposedly being prepared. Electricity and gas licences have different requirements and timetables; confirmation for an EU operator is a different procedure again.
Măglaș Alexandru Law Office assists with eligibility assessment, identifying gaps, applications and explanatory submissions, arranging exhibits and responding to Romania’s National Energy Regulatory Authority, ANRE. The mandate may include amendment or extension of an existing licence and assessment of refusal. Operational arrangements, accounts and employee experience need genuine supporting records; legal drafting cannot replace compliance with the requirements.
Four checks before filing
- Activity: supply, trading or generation.
- Applicant: Romanian company, EU operator or another applicant.
- File: documented funding, staffing and organisation.
- Timetable: registration, supplements, completeness and expiry.
Choosing the route and applicant
For electricity, use the regulation approved by ANRE Order 6/2025 as amended in 2026. For gas, use the regulation approved by Order 83/2025, published in Official Gazette 15 of 13 January 2026. Order 199/2020 was repealed; Article 4 of the new order applies the new regulation to pending applications too. An old checklist cannot be relied on merely because it worked for another company.
A supply licence includes the trading rights specified in the regulations without simultaneous holding of both licences for the same category. In gas, a trader licence does not permit supply to final customers. Generation, network operation and supply have their own classifications. Describe actual energy and contractual flows before choosing the application. A non-EU entity also needs assessment of the Romanian secondary-establishment requirement; the EU procedure cannot be extended to every foreign company.
Sources and legal provisions: Electricity licensing regulation approved by ANRE Order 6/2025; Gas licensing regulation approved by ANRE Order 83/2025; ANRE Order 83/2025: repeal and pending applications.
Eligibility: what to check before collecting exhibits
Check the applicant, activities shown in company records, legal status, controllers and management. The regulations contain barriers involving bankruptcy, specified previous withdrawals and particular unpaid energy-market liabilities. This is not a rule automatically excluding every company at every insolvency stage. For relevant prior events, obtain the act, reasons, date and challenge status before signing declarations.
A Romanian Trade Register status certificate has a maximum 30-day age at filing, alongside regulatory alternatives. Check the equivalent document for a foreign applicant; gas Article 10(2) also requires an authorised Romanian translation. Names, offices and representatives should match across the application, bank records and declarations. A management change during preparation may require updated exhibits.
Sources and legal provisions: Electricity licensing regulation approved by ANRE Order 6/2025; Gas licensing regulation approved by ANRE Order 83/2025.
Electricity: organisation, three employees and financial resources
Article 24 requires offices, customer centres, operating rules, an organisation chart and staffing information. Internal arrangements must address customer communications, complaints and risk management. A chart naming departments without duties and personnel is insufficient. Document who receives complaints, who investigates and how commercial risks are escalated.
The staffing rule requires at least 3 employees under individual employment contracts, each with at least 3 years’ previous electricity-sector experience. Attach employment records, certificates, CVs or other relevant evidence. A group company’s experience does not automatically establish the proposed individuals’ experience, and engaging a consultant does not prove the employment-contract condition. Reconcile periods and actual duties across the records.
Resources must reach the equivalent of€200,000 at the National Bank of Romania rate on the first day of the application-registration month. Article 24(3) permits one or more specified sources: equity calculated from the latest monthly trial balance, available bank credit lines and shareholder funding supported by evidence that the loan was actually received. A signed loan contract alone does not prove transfer of funds. This is not a universal€200,000 registered-share-capital requirement.
For an applicant that is also a generator, Article 24(4) allows the specified generating assets’ book value to count alongside permitted resources. Citizen energy communities and renewable energy communities have the paragraph(5) exception: exemption from the stated financial-resource evidence and reduction of the staffing requirement to one person. Establish status and eligibility; owning photovoltaic panels does not establish the exception.
Sources and legal provisions: Electricity licensing regulation approved by ANRE Order 6/2025.
Gas: separate requirements, including a recent bank statement
Article 13(1) requires operating rules covering supply, communications and complaints, Romanian offices and single contact points for final customers. It also requires at least 3 employees under individual employment contracts with at least 3 years’ gas-sector experience. Electricity-only experience is not automatic proof of gas experience. Common documents under Article 10 include the management-team declaration and CVs; the general manager needs the prescribed minimum 2 years of management experience.
For gas, Article 13(1)(c) specifies at least€200,000 in resources and addresses equity, bank statements, available credit lines and bank-loan agreements. It requires confirmation through a RON/euro bank statement no more than 3 days old at filing and signed by the legal representative. The reference rate is the first day of the registration month. Review the documents required by this specific wording rather than automatically copying the electricity regulation’s funding sources and evidence.
The file also includes the legal representative’s original declaration of expected quantities in the grant year: MWh for natural gas or biogas/biomethane and tonnes for liquefied natural gas. Explain the estimate from the actual business plan rather than inventing a figure. Existing holders should also check compliance evidence under Article 36, due within a maximum 6 months of the regulation’s approval. This transitional rule does not give every holder a fresh 6 months from reading this page.
Sources and legal provisions: Gas licensing regulation approved by ANRE Order 83/2025.
Preparing to enter the supply market?
Send the activity, company jurisdiction, available staff and launch timetable. We can identify the route and gaps before final declarations are prepared.
Official templates and their supporting records
| File | Template checked in the official source | Practical check |
|---|---|---|
| Electricity supply, legal entity | Annex 1, model 1.2 to regulation 6/2025 | Activity and full contacts; exhibit list |
| Previously filed electricity documents | Annex 1, model 1.4 | Identify the earlier file; actual continuing validity |
| Electricity controllers and managers | Annex 2, models 2.1/2.2 | Declarations for the relevant persons; model 2.3 is repealed |
| Gas supply | Annex 1 to regulation 83/2025 | Application and licence type with supporting exhibits |
| Gas declarations | Annex 2 for reuse, Annex 3 for controllers/managers, Annex 4 consent form | Apply to the persons and circumstances specified by the regulation |
| EU-operator confirmation | Annexes 1–2 to procedure 14/2024; declaration replaced in 2026 | Compare the updated version before using an older form |
A template is not the complete file. Prepare an index linking each regulatory requirement to its evidence, issuer, date and signatory. Electricity Article 18 also requires the specified financial records; a company formed in the application year has the rule concerning its latest completed monthly trial balance. Check each declaration against that person’s circumstances rather than having someone sign collectively for facts they cannot confirm.
Sources and legal provisions: Electricity licensing regulation approved by ANRE Order 6/2025; Gas licensing regulation approved by ANRE Order 83/2025; Procedure approved by ANRE Order 14/2024: confirmation of EU participants; ANRE Order 8/2026: amendments to EU-participant confirmation.
Filing, document language and signatures
For electricity, the application, exhibits and correspondence are in Romanian under Article 17. Exhibits are signed on each page by the legal representative or authorised person and sent through the designated portal, ANRE’s published email address or registry. Electronic and paper records have their prescribed certification requirements. Gas Article 8 also provides its own channels, including the electronic single contact point. Confirm the chosen route and retain the files exactly as submitted.
Do not assume every scan is sufficient or that every exhibit follows the same signature rule. For example, gas controller/management declarations under Article 10(1)(d) require an original or a qualified electronic signature. Assess that requirement separately from general electronic-filing provisions. Authority to act, signatures and contacts must identify the person committing the applicant.
Sources and legal provisions: Electricity licensing regulation approved by ANRE Order 6/2025; Gas licensing regulation approved by ANRE Order 83/2025.
Time limits: triggers and a complete application
| Stage | Electricity | Gas |
|---|---|---|
| Supply application review and possible clarification | Maximum 60 calendar days from registration, Article 30(1) | Maximum 60 days from registration, Article 9(1) |
| Applicant’s reply to requested supplements | Maximum 60 calendar days from receipt of notification, Article 30(2) | Maximum 60 days from receipt of notification, Article 9(2) |
| Decision after completeness | 60 days from a complete and compliant file, Article 30(4) | Up to 30 days from a complete file, Article 14(3) |
The complete-file decision period is not a promise of approval 30 or 60 days after the first email. Supplement deadlines run from receipt of notification, not its drafting date. Preserve receipt evidence and a point-by-point reply matrix. Generally, a file still incomplete 6 months after registration is closed under the relevant regulation; gas Article 9(4) also addresses extension where an inspection is taking place. This exception is not tacit grant of a licence.
ANRE may seek further clarification or verify information within its powers. Where a document has a different name, explain its contents and connection with the requirement. Electricity Article 32(3) permits assessment of documents equivalent in content or effect in duly justified cases. Acceptance cannot be guaranteed, and an explanatory letter cannot replace a missing statutory condition.
Sources and legal provisions: Electricity licensing regulation approved by ANRE Order 6/2025; Gas licensing regulation approved by ANRE Order 83/2025.
EU companies: confirmation has its own forms and timetable
Procedure 14/2024 as consolidated on 9 April 2026 requires assessment of the home-state right and ANRE confirmation for the corresponding activity. Article 6 covers the Annex 1 application, the document establishing the activity right and its uncertified Romanian translation, the Annex 2 declaration, market-participant code and home-authority information, alongside the fee. Other document categories do not automatically share that translation rule. Check the current declaration against the 2026 amendment, including its element on specified final REMIT decisions.
Initial review is 30 days from registration, an incomplete file is closed at 90 days from registration, and the decision is issued within 60 days of a complete, compliant file under Articles 7 and 9. Initial validity is at most one year, with successive extensions of up to 5 years within the home-state entitlement under Article 11. Article 15 requires the extension application at least 60 days before confirmation expires. Do not substitute the Romanian gas-licence extension window for these periods.
From 9 April 2026, Article 13(2)(d), which imposed a€1 million guarantee for the circumstances specified in the former text, is repealed. It is not a current general requirement. Repeal does not remove separately applicable contractual or market security. Where the home state does not issue licences, procedure Article 2(5) provides for a competent-authority document addressing that regime, activity scope and period. Coordinate it with gas regulation Article 8(7) and clarify the applicable route with ANRE; neither automatic confirmation nor a single solution for every such case should be assumed.
Sources and legal provisions: Procedure approved by ANRE Order 14/2024: confirmation of EU participants; ANRE Order 8/2026: amendments to EU-participant confirmation; Gas licensing regulation approved by ANRE Order 83/2025.
Duration, extensions and company changes
For electricity, a supply licence has the Article 13 maximum duration of 10 years. An extension within that maximum requires filing at least 60 days before expiry with the Article 41 documents. Reaching the maximum requires assessment of a new licence and its specific records, not automatic extension. For gas supply, initial validity is at most 5 years, with successive extensions within a 25-year total under Article 20(d). Always use the expiry date of the actual licence.
Gas-licence extension is requested in the 90-to 30-day window before expiry under Article 21. Missing the 30-day limit may cause the file to be treated as a new-licence application under that text. At maximum validity, a new-licence request has the separate minimum 90-day lead time. For changes of name, office or legal form, Article 22(9) requires an application within 15 days of Trade Register recording. Mergers and asset transfers have their own notices; they are not mere address changes.
Sources and legal provisions: Electricity licensing regulation approved by ANRE Order 6/2025; Gas licensing regulation approved by ANRE Order 83/2025.
Refusal or a licence measure: preserve both timetables
Obtain complete reasons and compare each with the requirement and submitted evidence. For electricity, Article 56(2) requires seeking revocation from ANRE within 30 days of service before the court action. Separately, individual acts require attention to the special 30-day judicial period from notification, assessed through Article 5(7) of Emergency Ordinance 33/2007 and Constitutional Court Decision 655/2020. Do not automatically add two 30-day periods or assume correspondence preserves the court deadline; assess the act and service immediately.
Gas regulation Article 19 refers to administrative litigation under the law; individual-act assessment includes the special regime and applicable prior procedure. Assess a stay separately under Law 554/2004, including the well-justified-case and imminent-harm conditions. Challenging refusal does not itself permit supply to begin. Paying a fine likewise does not automatically remove suspension or withdrawal where regulatory conditions are met.
Sources and legal provisions: Electricity licensing regulation approved by ANRE Order 6/2025; Emergency Ordinance 33/2007: ANRE powers and acts; Constitutional Court Decision 655/2020: individual ANRE acts; Gas licensing regulation approved by ANRE Order 83/2025; Administrative Litigation Law 554/2004: interim suspension.
Own working models for preparation, supplements and unusual situations
These law-office working structures are indicative and require verifiable facts and records. They are not ANRE templates or substitutes for official applications and declarations. Their purpose is to explain the file and connect each requirement to evidence without inventing conditions or exemptions.
1. Activity and applicant memorandum
Company [A], registered in [state], proposes [activity] for [customers/markets]. Energy is acquired from [sources], while [entity] contracts and invoices. We attach flow diagrams and existing rights. Please assess whether licensing or confirmation is required. We do not assert that activity may start before the applicable requirements are met.
2. Electricity financial-resources note
For the application registered in [month], use the National Bank of Romania rate for [date]. The table distinguishes equity, available bank credit lines and shareholder loans actually received. Link each amount to accounting and bank evidence, avoid double counting and explain changes between preparation and filing.
3. Gas bank-statement control list
Expected filing is [date]. The resource-confirmation statement is dated [date], in [currency], and checked against the 3-day limit in Article 13(1)(c). Identify resources and the legal representative’s signature. If filing is postponed, reassess statement age and the registration-month rate rather than retaining an outdated record.
4. Staff-experience evidence sheet
For person [A], identify the employment contract, position, relevant previous periods and sector: electricity/gas. Link each period to employment evidence and the CV. Flag gaps and overlaps. Explain actual duties behind generic consulting descriptions instead of automatically equating them with the required sector experience.
5. Point-by-point supplement reply
In file [number], we answer the notification received on [date]. For item [x], the requirement is [article], evidence [exhibit] and explanation [fact]. Identify replacements and continuing documents. Explain unavailable information and any express request without assuming the deadline has stopped or been extended.
6. Equivalent-document submission
Document [name], issued by [authority], establishes [fact]. Attach the document, required translation and a comparison with [regulatory requirement]. Explain the different form and verifiable information. Request reasoned assessment of equivalence under the applicable rules without asserting that ANRE is bound by our own classification.
7. Extension-application timetable
Act [number] expires on [date]. Identify an electricity licence, gas licence or EU confirmation and whether maximum validity has been reached. Record the applicable window, updated exhibits, responsibility and filing evidence. Plan continuity without treating dispatch of a request as an extended licence.
8. Request to correct a clerical error
Decision/licence [number] contains [error], while [exhibits] establish the correct information. Request correction and service of the corrected act. Distinguish clerical correction from changing the activity or challenging the decision. Gas Article 22(13) provides for corrective acts; this route must not be used to evade a challenge deadline.
After grant: conditions, fees and continuity
Read the licence together with its decision and associated general and specific conditions. Identify recurring duties, reports, the procedure fee and annual contribution. Check the applicable fee order and ANRE communication rather than confusing the authority’s charge with legal fees or market security. Gas Article 32 provides for annual contributions during suspension too.
Actual supply also requires appropriate contracts, customer arrangements, market access and relevant responsibilities. Assess REMIT registration and reporting separately against the actual activity; licensing does not prove their satisfaction. For changes to ownership, management, offices or assets, review rules and associated conditions before the transaction. Voluntary exit is not achieved by abandoning correspondence; regulations also require evidence concerning ongoing supply contracts when withdrawal is requested.
See how licensing connects with the project, grid and contracts
Guide to challenging Romanian regulatory decisions for foreign companies
Sources and legal provisions: Electricity licensing regulation approved by ANRE Order 6/2025; Gas licensing regulation approved by ANRE Order 83/2025.
Already have an application, notification or expiring licence?
Send the filed application, ANRE request, receipt evidence and existing act. We can identify necessary supplements and the deadline requiring protection.
Frequently asked questions
Can one application cover electricity and gas?
The files have separate regulations, requirements and forms. Reuse common information only under the relevant procedural conditions, declarations and updates.
Is€200,000 in registered share capital mandatory?
That is not the general wording. Assess permitted resources and evidence under the sector regulation, including the specific electricity-community exception.
Can I start while awaiting the decision?
Filing does not grant a licence or confirmation. Establish the effective right, validity and remaining conditions before the first operation.
Do I need a new gas bank statement if filing is postponed?
Recheck the 3-day age limit and registration month. Evidence suitable for the original date may no longer satisfy the requirement when actually filed.
Does EU confirmation remove Romanian obligations?
No. The confirmed activity’s obligations apply, and validity and conditions of the home-state right remain relevant.
What is the research cutoff?
The material considers legislation checked up to 5 November 2026. For actual filing, recheck amendments, forms and applicant circumstances.
Sources and legal provisions: Electricity licensing regulation approved by ANRE Order 6/2025; Gas licensing regulation approved by ANRE Order 83/2025; Procedure approved by ANRE Order 14/2024: confirmation of EU participants.
This material considers legislation and case law available up to 5 November 2026. The version applicable to the events or proceedings must also be checked for the particular case. This is general information.